Plasma Nitrider at Wallwork Cambridge

New Plasma Nitriding Capacity

With manufacturing rebounding post-pandemic, demand for plasma nitriding in aerospace, automotive, motorsport, and other industries is surging. To meet this need, Wallwork Group is expanding capacity by adding two new Rübig plasma nitriding furnaces, with the first set to arrive in August. Wallwork director, Simeon Collins, explained, “This is a Read more

By wallworkgroup, ago
3 Furnaces at Wallwork Heat Treatment

New Vacuum Carburise Furnace for Motorsport

Investing to Expand Capacity To support rising demand from motorsport suppliers, including F1 engine and transmission components, Wallwork Heat Treatment has invested in a cutting-edge vacuum carburising furnace at its Greater Manchester facility. Despite COVID challenges, this major investment boosts the group’s UK vacuum furnace total to 29, enabling daily Read more

By wallworkgroup, ago
PALMS Machine

Wallwork Group & Fintek LPartner to Enhance PALMS

New 3D Printed Metal Post Processing from Wallwork PALMS (Plasma Additive Layer Manufacture Smoothing), developed at Wallwork’s Cambridge R&D centre and Manchester machine build division, is a cutting-edge electrochemical plasma process designed to reduce surface roughness of 3D printed metal parts. This innovative technology, used by aerospace manufacturers, motorsport engineers, Read more

By wallworkgroup, ago
Wallwork HIP Center Drone Image

Wallwork to Open Hot Isostatic Pressing Centre

£10 million investment, 2500 square metres facility With a £10 million investment, Wallwork Group is establishing a state-of-the-art Hot Isostatic Pressing (HIP) centre at their Bury, North Manchester site. Housed in a newly prepared 2500 square metres facility, the first of their new HIPs is expected to be fully operational Read more

By wallworkgroup, ago