N7 at Wallwork Birmingham is the Group's 10 gas nitride furnace.

Wallwork Install Tenth Gas Nitride Furnace

Wallwork Heat Treatment has added a tenth gas nitride furnace. Demand is up and so is the need for gas nitriding larger loads. A £100,000 investment, the new unit is located at the company’s Birmingham heat treatment site. It is now running production loads. “From across aerospace, automotive, energy, tooling Read more

By Adrian Maguire, ago
Wallwork, Gold Sponsor of HIP 2025

Going for Gold: 14th Intern’l Conference

Wallwork Hot Isostatic Pressing is a ‘gold sponsor’ at the 14th International Conference on Hot Isostatic Pressing. It takes place from 6-10 April 2025 in Aachen, Germany. Along with other sponsors, the Wallwork HIP Centre team will be exhibiting their expertise to a European and international audience. Demand for hot Read more

By Adrian Maguire, ago